PET waterproof coil
Spec:
Brand:
Scope:
Operating proceduresAcceptance and cleaning the base (leveling layer) - preparation of adhesive (with the preparation) - treatment of complex parts (Yin and Yang Angle, eaves, water fall, pipe holes, etc.
Construction operation requirements
(1) the base surface (screed layer) of laying waterproof rolling materials must be cleaned, and water should be sprayed to ensure that the base is moist.(note: the roofing waterproof screed layer should comply with gb50207-94 roofing engineering technical specification, and the underground waterproof screed layer should comply with gbj208-83 underground waterproof engineering construction and acceptance specification).
(2) prepare cement slurry binder with polyvinyl alcohol gel solution containing cement weight of 10%-15%. The mixture must be uniform, no precipitation, no clotting and no segregation can be used.
(3) before the construction of the main waterproof layer of the roof, the drainage concentration and the details of the complex structure should be sealed and the coil material used for the additional layer and the main waterproof layer should be the same.(4) the sealing material is polyether polyurethane. If other sealing materials are selected, the product should not contain mineral oil, vaseline and other chemicals that affect the performance of polyethylene.
(5) additional layers should be laid at corners;The Angle of Yin and Yang are made into R= 20mm circular arc.
(6) waterproof roll shop stick should be used full shop method, adhesive coating brush on the base surface should be uniform, no exposure, no accumulation;Adhesive besmear after brush should immediately spread stick coil material, prevent time to be too long to affect bonding quality.
(7) the water-proof rolling material shall not be wrinkled, and the rolling material shall not be stretched forcibly. The air below the rolling material and the excess adhesive shall be eliminated while laying the rolling material, so as to ensure the bonding between the rolling material and the base surface and the rolling material of each layer is compact.
(8) the lap width of the waterproof rolling material shall not be less than 100mm.
(9) the upper and lower layers and two adjacent coils should be staggered by one-third of the amplitude.Operation procedure acceptance and cleaning the base (leveling layer) - preparation of adhesive (with the preparation) to deal with complex parts (Yin and Yang Angle, cornices, water fall, pipe holes, etc.) additional layer construction waterproof layer - waterproof layer inspection - protective layer construction acceptanceConstruction operation requirements
(1) the base surface (screed layer) of laying waterproof rolling materials must be cleaned, and water should be sprayed to ensure that the base layer is moist. Note: the roofing waterproof screed layer should comply with gb50207-94 roofing engineering technical specifications, and the underground waterproof screed layer should comply with gbj208-83 underground waterproof engineering application I and acceptance specifications).
(2) prepare cement slurry binder with polyvinyl alcohol gel solution containing cement weight of 10%-15%. The mixture must be uniform, no precipitation, no clotting and no segregation can be used.
(3) before the construction of the main waterproof layer of the roof, the drainage concentration and the details of the complex structure should be sealed and the coil material used for the additional layer and the main waterproof layer should be the same.(4) the sealing material is polyether polyurethane. If other sealing materials are selected, the product should not contain mineral oil, vaseline and other chemicals that affect the performance of polyethylene.
(5) additional layers should be laid at corners;The Angle of Yin and Yang are made into R= 20mm circular arc.
(6) waterproof roll shop stick should be used full shop method, adhesive coating brush on the base surface should be uniform, no exposure, no accumulation;Adhesive besmear after brush should immediately spread stick coil material, prevent time to be too long to affect bonding quality.
(7) the water-proof rolling material shall not be wrinkled, and the rolling material shall not be stretched forcibly. The air below the rolling material and the excess adhesive shall be eliminated while laying the rolling material, so as to ensure the bonding between the rolling material and the base surface and the rolling material of each layer is compact.
(8) the lap width of the waterproof rolling material shall not be less than 100mm.
(9) the upper and lower layers and two adjacent coils should be staggered by one-third of the amplitude.
Polymer polyester composite waterproof coiled material is on the basis of full study existing waterproof material, according to the new requirements of modern waterproof engineering development, the product technical performance indicators in the first part of the polymer waterproof material - sheet products choose PET membrane, its buy polyethylene layer from top to bottom, then double composite non-woven fabric, as a kind of new structure made of reinforced layer and waterproof material.This product creatively USES PET material, which is 9 times stronger than the tensile strength of polyethylene, as the main waterproof layer of the waterproof rolling material. Therefore, it has excellent physical and mechanical properties, which can significantly improve the fracture tensile strength, heat aging retention rate and other aspects.Compared with polyethylene O2 and CO2, PET is hundreds of times less impermeable, which enhances the function of composite waterproof coil and expands the application range of the product. PET itself has a strong ultraviolet and high temperature resistance performance, and adds additives to form a double protection, extending the service life of the sheet.The product is made of non-toxic, harmless and pollution-free synthetic polymer material, which is made into waterproof rolling material.When constructing this product, there is no special requirement for the water content of the leveling layer (base), as long as there is no clear water, the construction can be done, and the project quality is reliable.
Using range
1. Waterproofing of common roof, water storage surface and planting roof of industrial and civil buildings;
2, underground waterproof;
3, moisture-proof, steam separation;
4, toilet bath room waterproof;
5. Anti-seepage of pools, reservoirs and channels;
6. Tunnels, Bridges and culverts;
7. Anti-pollution projects such as waste disposal and chemical hazardous storage.